“Full bathroom in nine days. Plumbing, tiling, electrics, all signed off. The skip and the dust were gone too.”
One trade. One quote. One finished bathroom.
Plumbing, electrics, tiling, fittings — all by our own engineers. Fixed-price quotes, real timelines, and a two-year workmanship guarantee.

What's included
A bathroom you don't have to chase a second tradesperson for.
Every quote is a fixed price covering everything below. No follow-on invoices, no 'we'll have to get a tiler in', no last-minute electrician day rate.
Full strip-out & waste removal
Old suite, tiles and flooring out. Skip booked and removed at the end — included in the quote.
First-fix plumbing
New copper or Speedfit runs to spec. Isolation valves on every appliance. Pressure-tested before second fix.
Electrics & lighting
IP-rated downlights, shaver sockets, extract fans wired to building regs. Part P signed off.
Plastering & boarding
Tile-backer boards in wet areas. Skim-finished ceilings ready for paint. Walls left dead flat for tiling.
Tiling & flooring
Hand-cut tiling on a true-set base. Anti-slip flooring where appropriate. Grout colours matched to the suite.
Suite & fittings install
Showers, baths, basins, toilets, taps — all installed and tested. Sealed properly, not just to the eye.

The promise
The quote is the price. The schedule is the schedule.
We start when we say we'll start and we finish when we say we'll finish. If something on site changes the scope (it sometimes happens with older properties), we tell you before we touch it — never after.
7–10
Working days typical
2 yrs
Workmanship guarantee
£0
Hidden extras
From measure-up to handover
A clear four-stage installation.
No surprises, no scope creep. Each stage is signed off before we move to the next.
Free survey & quote
We visit, measure up, listen to what you want, then write a fixed-price quote within 48 hours.
Design & order-in
You pick the suite and finishes. We order everything in, schedule the start date.
Strip-out & first-fix
Old suite out, skip on the drive, new pipework and electrics run and tested.
Tile, fit, snag
Tiling, plastering, suite install, sealant, snag list walked with you before the final invoice.
Recent installations
A few of the bathrooms we've finished this year.




Real installations, real homes
What people say after their bathroom is signed off.
“Started on the day they said, finished on the day they said, and the price did not move once.”
“Genuine, helpful, tidy. Tiling is the part I was most worried about and it is faultless.”
“Disabled-facilities-grant ensuite, beautifully done. They handled the whole thing including the paperwork.”

